Construction Start Service

delbert css

The Adventist University of Africa (AUA) today marked yet another milestone. It was the Construction Start Service for the new Student Towers and the Faculty Housing Buildings. These two buildings are a much-needed response to the growing and urgent needs of the University for student and faculty accommodation.

The new Student Towers building will be the fourth addition to the student buildings, while the new Faculty Housing will host eight spacious apartments adding to the thirteen existing faculty houses. The Construction Start Service, overseen by the Vice Chancellor, Dr. Delbert Baker (see right), was an event that marked the official beginning of the construction process that is aimed to take at least 58 weeks.

After a short introduction from Dr. Baker, several representatives of the different groups at AUA expressed their joy and wishes that the project will be soon finished and will bring glory to God. The former Vice Chancellor of AUA, Dr. Brempong Owusu-Antwi, expressed inexpressible joy of the commencement of the project. He was grateful to God that the long-overdue student building would provide the necessary and needed accommodation to the students. He appreciated the current administration for their efforts and visionary spirit.

The two buildings will provide a conducive environment with modern quality solutions for the students and faculty, built within the shortest time possible as affirmed by the chief architect, Mr. Charles Misiani. He shall work in conjunction with qualified contractors, quantity surveyor and engineering team.

mutero css

 

Dr. Andrew Mutero, the East Central Africa Division (ECD) Education Director (see left) and Dr. Philip Baptiste, Special Assistant to the ECD President, offered the prayer of thanksgiving and consecration as the work commenced.

Indeed, AUA is growing and attaining to unstoppable heights while making provision for the increase of students and faculty. Several people representing the families, faculty, students, as well the administration of AUA expressed their belief that these buildings will be an expression of the quality and excellence championed by and in AUA.

 

Contact us

Use the below address to get a hold of the University.

  • Hot line: 254 733-333-451/452

Connect with us

We're on Social Networks. Follow us & get in touch.
You are here: Home News and Events Construction Start Service